Showing posts with label Filming Schedule. Show all posts
Showing posts with label Filming Schedule. Show all posts

Wednesday, 1 February 2017

Review of Filming - Day 3

Review of Filming


After arriving to our location, we were able to set up our camera and begin filming straight away. We began by getting shots of the mese en scene of the church. For example, the stain glass windows, the crucifix and the pictures on the wall.
Because the church we were given permission to use was catholic, it was highly decorative so proved really useful to our filming. It was decorated with beautiful stain glass windows which the light shined perfectly through for our shots. (As shown below)


We were able to really play around with shots and lighting with our camera and stabiliser. We filmed many low shots of feet and high shots of the stain glass windows to vary our shots, to make our film as professional as possible. We also filmed two match on action shots so that we can show our professional editing skills to the audience.



-Caera Mendez

Monday, 30 January 2017

Filming Schedule - Day 3

Filming Schedule


For our final day of filming, we have been able to get permission to go off site during school hours, to go to a church when it is open, so that we can film from inside. By doing so, we will be able to complete our montage editing part of the sequence. 

The day we have chosen to film is 31/1/17. Our aim for our final day of filming, is to get as much footage of religious imagery such as stain glass windows and crosses as possible. Our main aim, is to get as big as a variety as possible of camera angles, movement and framing.

The filming schedule for 31/1/17:

0745: Meet at location (church)
0800: Set up camera equipment
0810: Film as much religious imagery as possible
0900: Review our shots
0930: Try various camera angles, framing and movement of different shots
1000: Re-film any necessary shots (both inside and out of the church)
1030: Review shots again and re-film any necessary shots
1100: Back to school

Hopefully, by following this schedule, we will be able to achieve all the shots we wanted with the diverse use of camera framing, movement and angles. And by doing so, finish our editing of our film opening. 

-Caera Mendez



Wednesday, 25 January 2017

Review of Filming - Day Two

Review Of Filming

The Church:

Due to us having to wait until around five o'clock to begin filming so we could get consistent lighting, the church was closed so we could not get inside. However, we were still able to film numerous shots from the outside of the church of religious imagery which we could incorporate in our montage editing flashbacks. We also had the opportunity to work and practise with the camera and the stabiliser. 

Due to us filming at night, we found it quite difficult to get perfect lighting so that objects could be seen on camera. However we were able to overcome this by using torches on our mobile and standing around ten feet behind the camera itself. 

We were also able to play with a range of shots with numerous framing and angles. We got numerous mid shots as well as low shots, this will vary our sequence and help advance our opening as much as possible.

We were also, due to the location, really able to play around with mese en scene, as shown in the images below. We had the ability to use real stain glass windows and crosses from the church. This meant that we can up the amount of religious imagery and symbolism we use in opening to make it as effective as possible. 























-Caera Mendez

Saturday, 21 January 2017

Filming Schedule

Filming Schedule

Filming Day 2

We decided to create a filming schedule for the second day of filming in order to organise our time efficiently.

We had obtained satisfactory footage of all shots including the makeup special effects which left us with the other half of footage to complete, this being the religious montage we wanted to create. We decided that the best location for this would be within a church setting as this is epitome of religious mise en scene.

The day we have chose to film the second part of our footage is 25/01/17. Here, we aim to form several shots of religious objects such as stained glass windows and statues. We will form a variety of camera movements and try and include some camera techniques such as match on action. 

The filming schedule for 25/01/17 :
1630: Meet at location (church)
1645: Set up camera equipment  
1700: Filming inside of the church
1800: Review shots on the camera
1815: Continue filming or re-filming shots
1845: Move to the outside of the church
1900: Filming the outside of the church 
1920: Review the outside shots
1935: Continue filming/re-filming
1950: Pack equipment away
2000: Finish 

We have finished at 8 therefore if any misfortunes are to occur we are prepared to spend time after 8o clock  to film if it is necessary. 







Wednesday, 4 January 2017

Review of Filming Day One

Review of Filming

Day One: The Cellar

To organise our day efficiently, we stuck to the filming schedule as rigidly as possible. This allowed us to ensure we fit a substantial amount of work in a day's filming.

Objectives We Overcame:

  • The candles we used to light the cellar ran out after around 45 minutes - we had to replace these frequently, carefully ensuring we placed them in the same places.
  • The ceiling on the staircase to the cellar was extremely low - we had to carry objects to the landing one by one which was fairly time consuming.
Overall, our filming day was successful and we managed to film everything we had planned to. As it stands we should not have to re-film any of the scenes involving SFX makeup, which is good to reduce the likelihood of continuity errors.

Wednesday, 28 December 2016

Filming Schedule

Creating a Filming Schedule

As a group we decided that it would be wise to create a filming schedule to try and organise our time efficiently.

As our film opening will include fairly complex aspects of stage makeup, we need to ensure that we aim to film all of our scenes involving the stage makeup on one day, to avoid any inconsistencies within the míse en scene. 

The day we have chosen to start filming is 28/12/16. We decided that we would use this day to film all our scenes involving the protagonist and the stage makeup. The other scenes (the contents of the protagonist's flashbacks), for example the shots of the Church, will be filmed on a different day. 

The filming schedule for the 28/12/16 is as follows:

0900: Meet at location (my house)
0915: Gather and organise míse en scene items
0925: Carry all the míse en scene items to our location (the building conveniently next door)
0945: Clear out the cellar, moving all the paint pots and other items to the landing on the ground floor
1130: Carry down all our míse en scene items; the chair, stool, books and candles
1145: Gather the two pieces of scrap wood and using hemp cord, bind them together to form a cross
1200: Apply blood to the cross in the areas of crucifixion
1215: Arrange the items of míse en scene appropriately
1230: Trial different lighting techniques to sample which looks best on camera
1245: LUNCHBREAK
1330: Begin filming all the scenes that don't involve stage makeup
1445: Apply SFX makeup
1545: Film the rest of the scenes involving the SFX makeup
1700: Remove SFX makeup and place the paint pots back into the cellar
1900: finish

It is inevitable that minor inconveniences will happen, and we have accounted for this in our schedule. However it is possible that we will continue our filming day beyond 7pm.