Filming Schedule
For our final day of filming, we have been able to get permission to go off site during school hours, to go to a church when it is open, so that we can film from inside. By doing so, we will be able to complete our montage editing part of the sequence.
The day we have chosen to film is 31/1/17. Our aim for our final day of filming, is to get as much footage of religious imagery such as stain glass windows and crosses as possible. Our main aim, is to get as big as a variety as possible of camera angles, movement and framing.
The filming schedule for 31/1/17:
0745: Meet at location (church)
0800: Set up camera equipment
0810: Film as much religious imagery as possible
0900: Review our shots
0930: Try various camera angles, framing and movement of different shots
1000: Re-film any necessary shots (both inside and out of the church)
1030: Review shots again and re-film any necessary shots
1100: Back to school
Hopefully, by following this schedule, we will be able to achieve all the shots we wanted with the diverse use of camera framing, movement and angles. And by doing so, finish our editing of our film opening.
-Caera Mendez
No comments:
Post a Comment